Monday, January 2, 2017

http://dilbert.com/strip/2017-01-02

Remodelling my bathroom will take at least three days. I told my wife and she says, where do you get that number? I say, taking out sink and toilet is one step. Cutting out wall is another step. Removing floor tile is a step. Replacing floor tile is another step. replacing the wall and tiling is another step. Returning the toilet and sink is final step.
I say it will take 3 days.
I am not a quick worker. I just know it will take me time to do the steps, and 3 days is a conservative time frame.
Okay, I googled setting up programming environment after writing about my ignorance. I assumed it to be something from the context, hence the pseudo analogy to remodelling a bathroom.

No comments:

Post a Comment